In the 1st and 2nd stage project of ARYOM KORU there are
General use 250,71 m3 and 270,00 m3 2 outdoor pools,
General use 132,00 m3 2 indoor pools.
ARYOM KORU project of ARYOM İNŞAAT has been elected “The Best Housing” in 2017 in Sign of City Awards (SotCA) one of the most prestigous competitions of the construction sector. We are happy to be in such a prestigous project.

We have worked in collaboration with the Aryom architectural design and construction team in this project. The projects of all the outdoor pools, indoor pools and the saunas and steam rooms in the SPA center, all electrical and mechanical installments and delivery process are done by Pekcan team.
At the core of the project, there are general use outdoor pools. The outdoor pools have capacities of 250,71 m3 in the 1st stage and 132,00 m3 in the 2nd stage. The swimming pool standards are applied in the projects of the pools. As the disinfection system of the pools, ozone disinfection system is preferred combined with the automatic chlorine disinfection. The lighting of the pool is LED system that is green energy friendly.
In the SPA center of the facility, there are indoor heated pools. These are 132,00 m3 capacity pools in the 1st and 2nd stage. The projects of the pools are in accordance with the general use indoor swimming pool standards. As the disinfection system of the pools, ozone disinfection system is preferred combined with the automatic chlorine disinfection. The lighting of the pool is LED system that is green energy friendly. Water heating is also done by Pekcan team.
The projects of saunas and steam rooms within the SPA center, the lighting systems and heating are also done by Pekcan team.
We are very happy to have contributed to such a special project of İzmir.