In the Bornova Folkart TIME project of SAYA Group, there are;
General use 231,00 m3 capacity outdoor pool
Children pool of 6,70 m3 capacity
General use 77,50 m3 capacity indoor pool
Dry pool with 80,00 m3 volume,
Reflection pool with 17,50 m3 capacity
Also a general use 61,39 m3 capacity indoor pool of MEKTEBİM OKULLARI that is within the Folkart Time project.

In this project that is located in İzmir Bornova, we have collaborated with the Folkart architectural design team. All the projects of outdoor pools, children pool, indoor pool, reflection pool, dry pool and the indoor pool of MEKTEBİM OKULLARI, all electrical nad mechanical inplementations and delivery are done by Pekcan team.
In the middle of the site, there is a general use outdoor and children pool. The outdoor general use pool has a capacity of 231,00 m3. The pool is projected in accordance with the swimming pool standards. Ozone disinfection system combined with the automatic chlorine system is preferred as the disinfection system of the pools, which is an advanced hygenisation system.
The children pool has 6,70 m3 capacity. The filtration, disinfection and lighting units of the pool are designed in accordance with the children swimming pool standardisation paying attention to the health and hygene of children. Ozone disinfection system combined with the automatic chlorine system is preferred as the disinfection system of the pools, which is an advanced hygenisation system. The lighting system of the pool is green energy friendly LED system.
In the SPA center of the facility, there is a heated indoor pool with 77,50 m3 capacity. The pool is projected in accordance with the general use indoor pool standards. Ozone disinfection system combined with the automatic chlorine system is preferred as the disinfection system of the pools, which is an advanced hygenisation system. The lighting system of the pool is green energy friendly LED system. The heating of pool water is also made by Pekcan Havuz.
There is a dry pool within the facility. The capacity of this pool is 80,00 m3. By the help of a mobile sprinkler system a mobile water game area is formed within the paysage area. All mechanical implementations, electrical implementations and sprinkler system are projected and made by Pekcan.
There are reflection pools with various forms and dimensions and with 17,50 m3 water capacity. These pools are in harmony with the paysage. The filtration, disinfection and lighting of these pools are made the same with the other pools.
All the mechanical and electrical implementations of the swimming pool within MEKTEBİM OKULLARI with 61,39 m3 capacity are also made by our company. The pool is projected in accordance with the swimming pool standards. Ozone disinfection system combined with the automatic chlorine system is preferred as the disinfection system of the pools, which is an advanced hygenisation system. The lighting system of the pool is green energy friendly LED system.
We thank Saya Grup for preferring us in thi special project.
Paylaş :