Skip links

Bursa Emine Örnek Private Schools

YÜZME HAVUZU & SAUNA & SPA & WELLNESS

The swimming pool that is within the campus in Bademli, Bursa is 12,5m x 25,00m x 1,50m dimensions with a total capacity of 468,75 m3 in an olympic pool size, it is a heated indoor pool. Swimming pools standards are taken into consideration in constructing the pool. In the disinfection of the pool, ozone disinfection system that is an advanced technique, an automatic chlorine disinfection system. The heating of the pool water is also provided by our company.

The swimming pool of Bursa Emine Örnek Private Schools, one of the leading schools of Bursa, has Pekcan signature. With the target of the project growing up successful and healthy generations, the swimming pools of the school are built by Pekcan Havuz.

During the project process, we have colloberated with the architectural team of Bursa Özel Emine Örnek Okulları. The indoor pool, children pools and sauna within the SPA center that is used by the club members are all been projected by Pekcan team. Also all the electrical and mechanical projects are made by Pekcan as well.
The swimming pool that is within the campus in Bademli, Bursa is 12,5m x 25,00m x 1,50m dimensions with a total capacity of 468,75 m3 in an olympic pool size, it is a heated indoor pool. Swimming pools standards are taken into consideration in constructing the pool. In the disinfection of the pool, ozone disinfection system that is an advanced technique, an automatic chlorine disinfection system. The heating of the pool water is also provided by our company.

All the lane seperators to be used for training and competition purposes, jumping lanes, warning flags and other olympic pool equipments are produced in line with the swimming pool standards.
Also within the kindergarten of the school, 2 swimming pools are built for children. Both two pools have 30 m2 surface area. The depth of one of them is 0,5 m, the other 0,35m. . And the pool capacities are 15,00 m3 and 10,50 m3 respectively. These pools are projected for the aim of teaching swimming to small children. The pools are indoor and heated. For the disinfection of the pools, an advanced hygenic technique, ozone disinfection system is preferred. The heating of the pools are also made by us.

The design and building of the sauna within the campus are also made by Pekcan. The project of the sauna within the SPA center, the lighting of the area, heating and delivery in a workout position are all done by Pekcan Havuz.

We thank Bursa Emine Örnek Private Schools for choosing us.

Paylaş : 

Share on facebook
Share on twitter
Share on linkedin